Design A Roller Coaster Portfolio
Further explanation
Fix A to set up B is said to be a part if each fellow member of set A pairs is exactly ane member of set B
And then, i value of 10 is only assigned to ane value of y
If y is a function of x, so y = f (10)
Charge per unit of Change part shows the comparison between two objects that alter
If we utilise the annotation function, the rate of Alter from a part from a to b can be formulated as:
ROC = rate of change
the domain and range of this roller coaster
The Domain is the X values, 0-360
written as (0,360)
The range is the Y values, 0-250
written as (0,250)
2. a. The slope of the initial climb
from points 0,0 and 70,250
slope = 250/70 = iii.57
b. equation from bespeak 70,250
y-y1 = m (x-x1)
y-250 = 25/vii (x-70)
y = 25 / 7x-250 + 250
y = 25 / 7x
3. rate of change from (200, 200) to (300, 60) --- green hill
ROC = 60-200 / 300-200
ROC = -140/100
ROC = -1.4
4. rate of change from (200, 230) to (60, 30) - bluish hill
ROC = xxx-230 / sixty-200
ROC = -200 / -140
ROC = ane.42
v. The greater the slope, the steeper the line
the blue colina is steeper than the green loma because the gradient value of the blue loma is greater (steepness is not determined from the negative slope value)
6.the roller coaster is not a function, because in that location are 2 domain values that are paired with the codomain for case points 200,200 and 200,230
Design A Roller Coaster Portfolio,
Source: https://istudy-helper.com/mathematics/question13773181
Posted by: mooreoffing.blogspot.com

0 Response to "Design A Roller Coaster Portfolio"
Post a Comment